AZENCO / 2012 - 2012
Baku Crystal Hall
Baku Crystal Hall is a multipurpose sports and concert arena. The arena is designed to hold large-scale concerts and either team or individual sporting events. Baku Crystal Hall was constructed on the territory of Baku’s National Flag Cluster specifically to host Eurovision Song Contest 2012. The construction works carried out under the supervision of the State Committee in accordance with the decree of the President, Mr. Ilham Aliyev.
Launch 



Scope Of Works
- General construction
- Steel structures fabrication and installation
The construction of three main components of the stadium (the arena, facade, and roof) was launched in parallel at the same time.
The construction has been completed on the 16th of April 2012. The façade of Crystal Hall is equipped with numerous modern dynamic LED lights which allow creating various unique lighting effects.